CONSTRUCTION WORKS OF THE COLLECTION AND WATER NETWORK OF THE PLATFORM WATER_PORT OF TARANTO

The project

Works for the construction of the collection network, dispatching and treatment rainwater in the common areas of the Port and of the water network and sewer system in the eastern area of the Port of Taranto.
The interventions provide: construction of a system for the collection, treatment and disposal of rainwater falling on open areas (paved or asphalted) owned by the State in the territorial district of the Ionian Sea Port Authority – Taranto Port; construction of the sewerage network in the Eastern area of Taranto Port. The intervention involves network works involving excavations to a maximum depth of 5 meters for the installation of underground pipes and 4 meters for the tank inside the vacuum space.