The project
The new high-speed/high-capacity railway line Brescia East – Verona extends for about 48 km, crossing 2 regions, 3 provinces and 11 towns, mostly alongside the existing infrastructures in the territory, starting the route in Mazzano (Brescia) town, to Verona town, on the western side, with the new high-speed railways and the new Verona Merci interconnection. The agreement of works 4 “Lugana – Frassino Ovest” concerns the line and related works between km 127+343 and km 132+923 of the Brescia-Verona Functional Lot – Construction Lot 1, within the HS/HC Turin-Venice line, Milan-Verona section (Binario Pari). This includes high-speed/high-capacity line works and interlocking works belonging to the following main categories: Noise protection foundations; Railway embankments and ditches; Artificial tunnels (including natural tunnel embankments); Subways for cyclists and pedestrians; Water collection and discharge works. The contracted works are located in Desenzano del Garda and Pozzolengo in the province of Brescia and Peschiera del Garda in the province of Verona