REHABILITATION AND MODERNIZATION WORKS OF THE CONSTANTIN BRANCUSI PESTISANI TECHNOLOGICAL HIGH SCHOOL, MUNICIPALITY OF PESTISANI, GORJ COUNTY

The project

Upgrading works for the sports field by installing a concrete slab to be covered with a synthetic turf carpet; works to modernize the football pitch by installing an irrigation system; fencing, works to upgrade the fencing on the north-east, north-west and west sides, provided with insulated foundations, metal pipe and wire mesh; landscaping, upgrading and reconfiguration of alleys, roadway resurfacing, vertical landscaping; erecting a concrete-covered platform for waste disposal. The concrete covered platform for waste disposal will have a cold water tap nearby for proper washing. Domestic water will be collected via a siphon and discharged into the sewer system. STRUCTURE The concrete covered garbage platform will be reinforced. FUNCTIONAL DESCRIPTION The new alleys will be between 2 and 4 m in size, depending on their location. The designed sidewalks will follow the line of the buildings and will be framed by curbs. The designed sidewalks will follow the line of the buildings and will be framed by curbs. FINISHING SOLUTIONS AND STREET FURNITURE Exterior finishes: Pedestrian walkways will be made of non-slip concrete slabs. The driveways will be made of asphalt. Parking: there is parking for approximately 20 cars on the property. Fencing: Fencing is planned on the northeast, northwest and west sides with insulated foundations, metal pipes and wire mesh.